Dr. Dipu Moni's House (PWD project) — Steel Lift Core
A completed steel lift core delivered for Dr. Dipu Moni's House (PWD project).
- Client
- Dr. Dipu Moni's House (PWD project)

Duplex and triplex residences, resort buildings, foot-over bridges, emergency steel stairs and lift cores — engineered steel wherever an RCC solution isn't the right fit.
Steel framing suits residential and specialist structures where earthquake resistance, speed of construction or long-term resale flexibility matter — a duplex or resort building erected in weeks rather than months, on a frame that performs predictably under seismic loading.
This category also covers the smaller specialist structures every developer eventually needs: foot-over bridges, external emergency stairs and steel lift cores added to an existing building.
Each of these is delivered by our own engineering, fabrication and erection teams — not passed to a separate subcontractor.
Steel-framed homes designed for a faster build programme and strong earthquake performance relative to unreinforced masonry.
Steel frames for resort villas and low-rise hospitality buildings, suited to sites with tight construction windows.
Pedestrian steel bridge structures for factory campuses, institutions and public crossings.
Bolted external fire-escape stairs and standalone steel lift shafts added to existing buildings without major structural disruption.
Steel's ductility gives it well-documented seismic performance advantages over unreinforced masonry construction.
A bolted steel frame reaches lock-up stage in weeks, shortening the return on a residential or hospitality investment.
Stairs, lift cores and small bridge structures can be fitted to an existing building with minimal disruption to occupants.
An engineer visits the site to record the exact measurements and constraints the design has to work with.
Structural calculation and design turned around fast, so the client has a firm design and quote to work from quickly.
Steel is fabricated to the approved drawings, then transported and bolted together on site by our own erection crew.
The finished structure is checked against the approved drawings before it is signed over to the client.

A completed steel lift core delivered for Dr. Dipu Moni's House (PWD project).

A completed composite duplex farm house delivered for a private client.

A completed 3 storied steel building delivered for Alokito Hridoy Foundation.
Still not answered?
Send us the specifics and a named engineer will come back to you within two working days.
Ask us directlyClear-span steel structures built for production, not just shelter
Factory sheds, warehouses, godowns and process buildings engineered as pre-engineered steel structures — fast to erect, easy to expand, built to run.
Steel-framed retail, office and fuel-service structures
Multi-storied steel buildings, retail and market structures, super shops and filling station canopies — framed for long spans and a fast fit-out.
Purpose-built steel structures for farms, feed and grain
Poultry sheds, cattle farm structures, grain storage, feed mill and auto rice mill buildings, and auto brick field sheds — steel structures sized for ventilation, hygiene and throughput.
Tell us the constraint that worries you most. We will give you a straight assessment of what is achievable and what it will take.