Skip to main content
Universal Structural Steel
Our Factory

Where every frame is cut, welded and prepared

Our own fabrication workshop in Bhaluka, Mymensingh — not a subcontracted workshop — is where primary frames, purlins and cladding are cut, drilled, welded and coated to drawing before they ever reach a site.

Factory address

North Kasor, Square Master Bari, Bhaluka, Mymensingh

Factory hotline

+880 1729-298935
Factory setup

Fabrication kept in-house, start to finish

Cutting, forming, welding, coating and quality checks happen under our own roof — not queued behind a third-party workshop's schedule.

  • Auto Welding Machine

    H-beam workstation for assembly welding and straightening.

  • CNC Cutting Machine

    Multi-head cutting machine — 9 strip-flame torches plus 2 CNC flame cutting torches.

  • H-Beam Flange Straightening Machine

    Corrects flange alignment on built-up H-beam sections before assembly.

  • ARC Welding Machine

    Manual arc welding for structural connections and repairs.

  • Assembling Machine

    Positions and tacks built-up sections ahead of full welding.

  • Shear Cutting Machine

    Straight-line shearing of steel plate and sheet to size.

  • Sheet Profile Machine

    Roll-forms profiled roof and wall cladding sheets.

  • Magnet Drill Machine

    Portable magnetic-base drilling for site and workshop steel.

  • MIG Welding Machine

    Gas metal arc welding for faster, cleaner structural joints.

  • Sand Blasting Machine

    Surface preparation before priming and coating.

  • Paint Spray Machine

    Even, controlled application of primer and finish coats.

  • Stand Drill Machine

    Bench-mounted precision drilling for plates and connections.

  • Radial Drilling Machine

    Drills large or heavy sections that can't be moved to a bench drill.

  • Ironworker Machine

    Combined punching, shearing and notching of structural steel.

  • Generator

    Independent power supply keeping fabrication running without interruption.

  • Saw Welding Machine

    Submerged-arc welding for long, consistent structural seams.

Pre-engineered steel building frame under a clear sky, ready for cladding

Every frame engineered to hold its line — from foundation bolt to roof ridge.

Materials specification

What actually goes into a structure

The components, grades and coatings our steel buildings are fabricated from.

ComponentSpecificationStrength
Built-up sectionM.S. Plate — ASTM A572-50 gradeFy = 345 MPa
Purlin and girtRolled formed steel, minimum yield stress 275 MPaFy(min) = 275 MPa
Roof and wall claddingHi-Ten painted 0.47mm steel, 55% aluminium / 45% zinc coating, AS1397 G550-AZ150Fy = 550 N/mm²
Anchor boltsGalvanized / naturally quenched blackFy = 24.5–35.0 kN/cm²
High-strength boltsA325M Type 1, hot-dip galvanized / naturally quenched blackFt = 55 kN/cm²
Concept to construction

See where your structure gets built

From site measurement through to fabrication in Bhaluka and erection on your site — one accountable team, start to finish.